I. Processing Processes and Technical Key Points
1. Design and Material Selection
Ağdaş Modular Design: Use standardized containers (such as 20/40 feet) as basic units, and optimize the space layout with the help of BIM technology to ensure the flexibility of splicing and the stability of the structure.
Ağdaş
Material Selection: The main body adopts a weathering steel (such as Corten steel) or galvanized steel frame. Lightweight composite materials (such as aluminum honeycomb panels + rock wool insulation layer) are used for the internal and external walls, which have both strength and thermal insulation performance.
Ağdaş
Compliance: The design needs to comply with international container construction codes (such as ISO 668) and the building safety standards of the target area (such as wind resistance and seismic grade).
Ağdaş
2. Main Body Processing
Structural Transformation: Cut the side panels of the container to form door and window openings, and laser cutting ensures precision; install H-shaped steel or square tube skeletons inside to enhance the load-bearing capacity (for example, additional support is required for the second floor structure).
Ağdaş
Ağdaş Surface Treatment: After sandblasting to remove rust, coat with an epoxy primer + polyurethane topcoat, or use externally hung anodized aluminum plates to improve corrosion resistance.
Ağdaş
Ağdaş Thermal and Sound Insulation: Fill with a polyurethane foam layer (thickness ≥ 80mm), combined with double-layer insulating Low-E glass to achieve high energy efficiency with a U-value ≤ 0.3 W/m²K.
Ağdaş 3. Pre-installation of Functional Systems
Ağdaş
Ağdaş Pre-embedding of Water and Electricity Pipelines: Integrate PPR pipes and flame-retardant cables, pre-install an intelligent control system (such as the KNX bus), and reserve photovoltaic interfaces to support off-grid power supply.
Ağdaş
Ağdaş Equipment Integration: Embed a split-type air conditioner and a fresh air system (PM2.5 filtration efficiency ≥ 95%). The kitchen and bathroom adopt overall modular installation (such as one-piece forming of 304 stainless steel).
Ağdaş
Ağdaş 4. Interior Fine Decoration
Ağdaş Environmentally Friendly Materials: Select formaldehyde-free panels (such as OSB board + water-based paint), and lay SPC snap-lock flooring on the ground (waterproof and moisture-proof).
Ağdaş
Smart Home: Pre-install embedded IoT devices (such as voice control panels, electric curtain rails), and support 5G/Wi-Fi 6 access.
Ağdaş
Ağdaş II. Installation Processes and Technical Specifications
1. Site Preparation
Ağdaş
Ağdaş Foundation Treatment: Select the foundation form according to the geological report - use pile foundations (such as micro steel pipe piles) in soft soil areas, and for hard foundations, a concrete raft foundation (thickness ≥ 200mm) or a steel structure ground beam can be used.
Ağdaş Pre-connection of Water and Electricity: Pre-embed water supply and drainage pipes and cable trenches, and install a septic tank or connect to the municipal pipeline network (it needs to meet local environmental protection requirements).
Ağdaş 2. Hoisting and Fixing
Ağdaş Module Transportation: Use a low-bed flatbed truck for transportation, and control the weight of a single container within 25 tons (standard for a 40-foot HQ container).
Ağdaş
Ağdaş Precise Positioning: Use a total station to calibrate the level. Connect the modules with high-strength bolts (such as grade 10.9) or welding, with an error ≤ 3mm.
Wind-resistant Anchoring: The diameter of the anchor bolts ≥ M20, and the depth ≥ 500mm. In typhoon areas, additional diagonal steel cables (such as Φ12mm steel wire ropes) need to be added.
3. System Joint Debugging
Ağdaş
Pipeline Connection: Connect the water and electricity pipelines with quick connectors, and conduct a pressure test (maintain a pressure of 0.6MPa for the water supply for 30 minutes without leakage).
Ağdaş
Ağdaş Energy System: Optimize the inclination angle of the photovoltaic panels according to the local latitude, and configure the capacity of the energy storage battery pack (such as LiFePO4) at 1.5 times the daily power consumption.
Ağdaş
Ağdaş 4. Acceptance and Debugging
Ağdaş
Structural Safety: A third-party testing agency issues a load report (such as the live load on the top ≥ 150kg/m²).
Ağdaş
Ağdaş Environmental Protection Certificate: Ensure that the formaldehyde emission of the materials ≤ 0.03mg/m³ (EN 717-1 standard), and the noise level ≤ 40dB (A).
Ağdaş
III. Innovation and Cost Optimization Suggestions
Ağdaş
Rapid Disassembly and Assembly Technology: Develop patented connection nodes (such as mortise and tenon-style buckles) to shorten the on-site installation time to within 3 days.
Ağdaş Circular Economy: Transform second-hand containers (cost reduced by 30%), and match them with a detachable interior installation system for easy secondary use.
BIPV Technology: Integrate thin-film solar panels (such as CIGS) as exterior wall materials to achieve a zero-energy consumption building.
Ağdaş
Ağdaş
Ağdaş IV. Regulations and Market Adaptation
Ağdaş
Approval Process: In some regions, container buildings are classified as temporary facilities (no building planning permit is required), but they need to meet fire protection (such as GB50016) and electrical safety codes.
Application Scenarios: Focus on promoting it in fields such as cultural and tourism homestays (such as in mountainous areas and coastal areas), emergency housing (delivered within 72 hours), and mobile commercial spaces (coffee shops, exhibition halls), etc.
Ağdaş
Ağdaş
Through standardized production and intelligent management, the space capsule container house can significantly reduce the comprehensive cost (about ¥2000-4000 yuan/m²), and become an important solution for sustainable buildings. In actual projects, customized design is required in combination with the local climate (such as adding underfloor heating in extremely cold regions) and cultural aesthetics.